Current Job Openings
Project Scheduler
Client: Midstream
Location: Starting out Remote and short trips to Dallas- Fort Worth area
Duration: 1 year could go longer
Benefits: Health, Vision, Dental, 401K, Paid Time Off
Key responsibilities
- Develop resource-loaded baseline schedules in Primavera P6 for multiple projects, using a consistent WBS and coding structure.
- Integrate engineering, procurement and construction schedules from the EPC firm, vendors and contractors into one master schedule.
- Track long lead equipment (compressors, pipe, valves, CO2 equipment) and align deliveries with construction sequencing.
- Update schedules regularly; analyze progress, the critical path and float, and flag delays early with recovery options.
- Prepare weekly look-aheads, monthly schedule reports and executive dashboards.
- Evaluate the schedule impact of scope changes, change orders and delays, and support claims analysis when needed.
- Work closely with cost control, estimating and project management to keep schedule, cost and forecast aligned.
- Help set up scheduling standards, templates and processes as the project portfolio grows.
Required qualifications
- 5+ years of project scheduling on capital projects in midstream, oil and gas, or energy.
- Advanced Primavera P6 skills, including resource loading and multi-project schedules.
- Experience on greenfield pipeline, compression, gathering or gas processing projects.
- Experience managing and reviewing EPC contractor schedules.
- Strong understanding of engineering, procurement and construction sequencing.
Preferred qualifications
- Carbon capture, CO2 pipeline or CO2 injection project experience.
- Experience building scheduling processes for a new or growing project team.
- PMI-SP, AACE PSP or similar certification.
- Experience with schedule risk analysis (such as Primavera Risk Analysis or Safran).
