Current Job Openings

Project Scheduler

Apply Now Back to Search Results
Project Scheduler

Location: Houston, TX 77024
Pay Rate: $73.82

Overview: 
The Project Scheduler is responsible for planning, scheduling, and progress reporting in support of proposals and projects. Duties will typically be performed within an office setting during the Proposal and Engineering phases and then on site during Construction and Commissioning.

Basics:
  • Develop, maintain, and communicate the project time schedule
  • Use the project time schedule to drive the execution and timely completion of the project
  • Work in accordance with the clients' scheduling procedures and requirements
  • Capture REX (Return of Experience) to promote continuous improvement
  • Contribute actively to the knowledge exchange within the Scheduling Team

Proposal Phase:
  • Participate in the execution strategy and develop the frame schedule
  • Challenge the duration and sequence-of-development / constructability
  • Prepare the Basis of Schedule, including clear and specific assumptions
  • Prepare the Project Schedule Execution Plan
  • Utilize REX analysis and knowledges for support during the client negotiation phase

Project Baseline:
  • Establish, maintain, and follow up plans and progress in accordance with internal procedures
  • Develop baseline progress schedule using existing templates and/or reference projects
  • Revise and/or assign activity codes & WBS structure for baseline progress schedule
  • Revise and/or develop required layouts for baseline progress schedule
  • Revise and/or assign resources for baseline progress schedule
  • Revise and/or load manhours, quantities, and cost into baseline progress schedule
  • Develop baseline progress curves using both early and late finish dates
  • Develop progress measurement tables for tracking of deliverables &/or quantities installed
  • Prepare SMART presentations to discuss, summarize and validate the planning assumptions and basis

Project Execution:
  • Collect progress status from client, engineering, operations, suppliers, and third party entities. 
  • Assist the technical team with internal schedules to control and monitor key tasks.
  • Prepare forecast schedules based on actual project status and anticipated evolution. 
  • Track the internal and external milestones versus the contract, target, and previous forecast
  • Update progress curves using both earned and remaining (forecast) values.
  • Analyze critical path(s), schedule variances, progress trends, and resource allocation
  • Develop and implement solutions / mitigation strategies for identified critical scenarios / problems.
  • Communicate status and analysis to project team via schedule layouts, written narrative, and briefings.
  • Assist in the preparation of weekly and monthly reports.
  • Keep a record of changes to the schedules via backup copy and 'Maintain Baseline' function in P6.
  • Update the Bases of Schedule, including mitigation actions taken in the monthly update

Construction:
  • Assist the site manager and subcontractor manager with planning
  • Perform quantity takeoffs
  • Confirm local rates of production for determination of budget manhours & schedule duration
  • Refine standard Schedule Specification for each ITB (Invitation to Bid)
  • Review subcontractor schedules for adherence to project specifications and need dates
  • Understand and challenge the subcontractors' plans before implementation into the main schedule
  • Import subcontractor schedules into the master progress schedule and make necessary logic ties
  • Walk jobsite and evaluate physical progress
  • Review accuracy of subcontractor schedule updates and adherence to their initial plan
  • Analyze subcontractor claims for delay and associated mitigation / recovery plans
  • Incorporate contract changes into the master progress schedule
  • Prepare schedules as requested or by anticipation, proposing scenarios and what-if simulations
  • Backup all Planning related as-builts and Lessons Learned to ensure benchmark and handover

For immediate consideration, please send resumes to Samantha.Turrubiartes@PTSAdvance.com

#IND1